IVI Framework Viewer

Requirements

A1

Manage requirements and their traceability throughout the IT solutions delivery life cycle to serve business needs.

Improvement Planning

Practices-Outcomes-Metrics (POM)

Representative POMs are described for Requirements at each level of maturity.

1Initial
  • Practice
    Practices are ad hoc and are on a best endeavour basis.
2Basic
  • Practice
    Gather both functional and non-functional requirements within IT through qualitative data collection techniques such as interviews and workshops.
    Outcome
    The IT solution delivered will address the IT requirements of the organization.
    Metric
    # of IT requirements specified.
3Intermediate
  • Practice
    Engage and Involve all relevant stakeholders (business & IT) and users as necessary during the requirements gathering process.
    Outcome
    Ensures both functional and non-functional requirements from both IT and other business units are gathered resulting in increased buy-in by stakeholders.
    Metric
    % of stakeholders made up from IT and other business units involved in the requirements gathering process.
4Advanced
  • Practice
    Evaluate methods to allow user/business requirements to be traced from requirements source to design, implementation and testing (in both directions).
    Outcome
    Methods are available to allow requirements to be traced in both directions throughout the Solutions Delivery lifecycle.
    Metric
    % of requirements traceability methods that allow bidirectional traceability through the full Solutions Delivery lifecycle.
5Optimized
  • Practice
    Introduce new and emerging innovative methods and techniques for requirements gathering, analysis, design and implementation into Solutions Delivery on a continual basis with external stakeholder input.
    Outcome
    The quality of the implemented IT solution is improved.
    Metric
    # of requirements gathering methods introduced with input from external stakeholders.